{"id":72889,"date":"2025-12-02T09:00:26","date_gmt":"2025-12-02T13:00:26","guid":{"rendered":"https:\/\/www.avantage-plus.com\/?p=72889"},"modified":"2025-12-02T16:57:57","modified_gmt":"2025-12-02T20:57:57","slug":"collaboration-and-innovation","status":"publish","type":"post","link":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/","title":{"rendered":"Why phased planning in an integrated design project accelerates complex project delivery"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column width=&#8221;1\/1&#8243;][vc_column_text]<\/p>\n<h1 data-start=\"0\" data-end=\"115\">Closing faster with the integrated design process: turning a building project into a true high-performance asset<\/h1>\n<p data-start=\"117\" data-end=\"475\">On the commercial real estate market in Quebec, every week of delay can make the difference between a vacant space and a revenue-generating one. Whether you are a building owner, commercial broker or developer, you see it every day: many building projects remain hard to lease because the space feels generic, abstract or simply impossible to imagine in use.<\/p>\n<p data-start=\"477\" data-end=\"712\">The good news is that by rethinking the design phase with an integrated design process (IDP), your spaces can become real magnets for tenants, while staying aligned with budget, schedule and long-term sustainability objectives.<\/p>\n<p data-start=\"714\" data-end=\"1066\">An integrated design project is not just \u201cbetter drawings\u201d. It is a collaborative approach to building design that brings stakeholders together early and uses optimization, simulation and strategic decision-making to deliver high-performance and cost-effective results over the entire life cycle of the building.<\/p>\n<h3 data-start=\"1073\" data-end=\"1131\"><\/h3>\n<h2 data-start=\"1073\" data-end=\"1131\">The problem with generic spaces and traditional design<\/h2>\n<p data-start=\"1133\" data-end=\"1377\">During a visit, a potential tenant decides very quickly if a space works. If the layout is unclear, has no identity or does not match their needs, the conversation stalls, negotiations drag on and your building projects lose attractiveness.<\/p>\n<p data-start=\"1379\" data-end=\"1508\">In many cases, the root cause is a traditional design or conventional design process where disciplines work in isolation:<\/p>\n<ul data-start=\"1510\" data-end=\"1883\">\n<li data-start=\"1510\" data-end=\"1566\">\n<p data-start=\"1512\" data-end=\"1566\">plans are technical and hard to read for non-experts<\/p>\n<\/li>\n<li data-start=\"1567\" data-end=\"1634\">\n<p data-start=\"1569\" data-end=\"1634\">functionality and air quality are not clearly expressed<\/p>\n<\/li>\n<li data-start=\"1635\" data-end=\"1712\">\n<p data-start=\"1637\" data-end=\"1712\">the building envelope and building systems are optimized too late<\/p>\n<\/li>\n<li data-start=\"1713\" data-end=\"1778\">\n<p data-start=\"1715\" data-end=\"1778\">the construction team is not involved in early stages<\/p>\n<\/li>\n<li data-start=\"1779\" data-end=\"1883\">\n<p data-start=\"1781\" data-end=\"1883\">the impact of each design stage on long-term energy use and durability is underestimated<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1885\" data-end=\"2157\">From a tenant\u2019s point of view, this type of building design is abstract. They must imagine what the space could become instead of experiencing clear, credible design solutions. In a competitive market, they often choose a project where the vision is more tangible.<\/p>\n<h3 data-start=\"2164\" data-end=\"2224\"><\/h3>\n<h2 data-start=\"2164\" data-end=\"2224\">From conventional design to an integrated design process<\/h2>\n<p data-start=\"2226\" data-end=\"2436\">The integrated design process changes the rules. Instead of handing a concept from one discipline to the next, IDP brings everyone together upfront in the early design and concept design stages.<\/p>\n<p data-start=\"2438\" data-end=\"2478\">A typical IDP project team includes:<\/p>\n<ul data-start=\"2480\" data-end=\"3005\">\n<li data-start=\"2480\" data-end=\"2523\">\n<p data-start=\"2482\" data-end=\"2523\">architects and the core design team<\/p>\n<\/li>\n<li data-start=\"2524\" data-end=\"2634\">\n<p data-start=\"2526\" data-end=\"2634\">mechanical engineer and hvac specialists, often focused on hvac systems and energy systems<\/p>\n<\/li>\n<li data-start=\"2635\" data-end=\"2725\">\n<p data-start=\"2637\" data-end=\"2725\">electrical engineers responsible for lighting, power and many building systems<\/p>\n<\/li>\n<li data-start=\"2726\" data-end=\"2788\">\n<p data-start=\"2728\" data-end=\"2788\">structural engineers and civil engineering experts<\/p>\n<\/li>\n<li data-start=\"2789\" data-end=\"2874\">\n<p data-start=\"2791\" data-end=\"2874\">a project manager coordinating the IDP and ensuring clear decision-making<\/p>\n<\/li>\n<li data-start=\"2875\" data-end=\"2929\">\n<p data-start=\"2877\" data-end=\"2929\">the owner, operator and other key stakeholders<\/p>\n<\/li>\n<li data-start=\"2930\" data-end=\"3005\">\n<p data-start=\"2932\" data-end=\"3005\">the construction team and selected team members from key trades<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3007\" data-end=\"3182\">This teamwork transforms the process into an integrated design project where each discipline influences the others. The collaborative approach allows the group to:<\/p>\n<ul data-start=\"3184\" data-end=\"3557\">\n<li data-start=\"3184\" data-end=\"3246\">\n<p data-start=\"3186\" data-end=\"3246\">set clear performance and sustainability targets early<\/p>\n<\/li>\n<li data-start=\"3247\" data-end=\"3353\">\n<p data-start=\"3249\" data-end=\"3353\">explore high-performance options for the building envelope, hvac and energy efficiency<\/p>\n<\/li>\n<li data-start=\"3354\" data-end=\"3446\">\n<p data-start=\"3356\" data-end=\"3446\">verify environmental impact and environmental performance through simulation<\/p>\n<\/li>\n<li data-start=\"3447\" data-end=\"3557\">\n<p data-start=\"3449\" data-end=\"3557\">align design decisions with real constructability and cost savings in the construction process<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3559\" data-end=\"3702\">Instead of reacting to problems at the end of the design stage, the team engages in iterative problem-solving right from the beginning.<\/p>\n<h3 data-start=\"3709\" data-end=\"3756\"><\/h3>\n<h2 data-start=\"3709\" data-end=\"3756\">Key stages of the integrated design process<\/h2>\n<p data-start=\"3758\" data-end=\"3957\">A well-structured integrated design process follows several key stages. While each project is unique, the logic is very similar whether you are delivering a new build or a complex renovation.<\/p>\n<h3 data-start=\"3959\" data-end=\"4000\">1. Early stages and concept design<\/h3>\n<p data-start=\"4001\" data-end=\"4057\">In the early stages, the project team clarifies:<\/p>\n<ul data-start=\"4059\" data-end=\"4350\">\n<li data-start=\"4059\" data-end=\"4118\">\n<p data-start=\"4061\" data-end=\"4118\">the vision for the space and required functionality<\/p>\n<\/li>\n<li data-start=\"4119\" data-end=\"4186\">\n<p data-start=\"4121\" data-end=\"4186\">environmental performance and energy efficiency targets<\/p>\n<\/li>\n<li data-start=\"4187\" data-end=\"4269\">\n<p data-start=\"4189\" data-end=\"4269\">ambitions in terms of green building, net zero or other certifications<\/p>\n<\/li>\n<li data-start=\"4270\" data-end=\"4350\">\n<p data-start=\"4272\" data-end=\"4350\">how long-term life cycle costs will be balanced with upfront investments<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4352\" data-end=\"4538\">At this point, the integrated design process uses workshops with stakeholders to identify constraints, opportunities and key success factors before any final design is fixed.<\/p>\n<h3 data-start=\"4540\" data-end=\"4579\">2. Early design and design phase<\/h3>\n<p data-start=\"4580\" data-end=\"4791\">During the design phase, the design team develops multiple scenarios. The mechanical engineer, electrical engineersand structural engineers test options through simulation to understand:<\/p>\n<ul data-start=\"4793\" data-end=\"5028\">\n<li data-start=\"4793\" data-end=\"4826\">\n<p data-start=\"4795\" data-end=\"4826\">energy use and peak loads<\/p>\n<\/li>\n<li data-start=\"4827\" data-end=\"4897\">\n<p data-start=\"4829\" data-end=\"4897\">impact of the building envelope on comfort and air quality<\/p>\n<\/li>\n<li data-start=\"4898\" data-end=\"4965\">\n<p data-start=\"4900\" data-end=\"4965\">integration of hvac systems with other building systems<\/p>\n<\/li>\n<li data-start=\"4966\" data-end=\"5028\">\n<p data-start=\"4968\" data-end=\"5028\">compliance with building codes and technical standards<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5030\" data-end=\"5297\">The integrated design process deliberately keeps this stage iterative. The team members compare design solutions and refine them through optimization, always considering constructability, cost-effective strategies and long-term durability.<\/p>\n<h3 data-start=\"5299\" data-end=\"5334\">3. Detailed and final design<\/h3>\n<p data-start=\"5335\" data-end=\"5420\">As the design stage advances, the IDP focuses on coordination and risk reduction:<\/p>\n<ul data-start=\"5422\" data-end=\"5669\">\n<li data-start=\"5422\" data-end=\"5508\">\n<p data-start=\"5424\" data-end=\"5508\">the construction team reviews details that affect the construction process<\/p>\n<\/li>\n<li data-start=\"5509\" data-end=\"5585\">\n<p data-start=\"5511\" data-end=\"5585\">clashes between disciplines are resolved in the model instead of on site<\/p>\n<\/li>\n<li data-start=\"5586\" data-end=\"5669\">\n<p data-start=\"5588\" data-end=\"5669\">technical choices are validated against building codes, schedule and budget<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"5671\" data-end=\"5978\">By the time the team reaches the final design, the integrated design process has already reduced many of the typical surprises that often appear in conventional design workflows. The result is a clearer scope, more predictable cost savingsand a smoother path to a high-performance building.<\/p>\n<h3 data-start=\"5985\" data-end=\"6036\"><\/h3>\n<h2 data-start=\"5985\" data-end=\"6036\">Why IDP accelerates leasing and increases value<\/h2>\n<p data-start=\"6038\" data-end=\"6136\">For commercial clients and tenants, the benefits of an integrated design process are concrete.<\/p>\n<ul data-start=\"6138\" data-end=\"6554\">\n<li data-start=\"6138\" data-end=\"6222\">\n<p data-start=\"6140\" data-end=\"6222\">Spaces feel more coherent, with functionality aligned to real business needs<\/p>\n<\/li>\n<li data-start=\"6223\" data-end=\"6346\">\n<p data-start=\"6225\" data-end=\"6346\">Energy efficiency, environmental impact and air quality are not afterthoughts, but part of the core concept<\/p>\n<\/li>\n<li data-start=\"6347\" data-end=\"6441\">\n<p data-start=\"6349\" data-end=\"6441\">The project is more likely to deliver high-performance in operation, not just on paper<\/p>\n<\/li>\n<li data-start=\"6442\" data-end=\"6554\">\n<p data-start=\"6444\" data-end=\"6554\">Better coordination leads to fewer changes during construction and more reliable cost-effective outcomes<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"6556\" data-end=\"6861\">When a prospect visits an IDP-based project, they experience a green building that has been thought through in depth. The integrated design process has already balanced energy systems, comfort, branding and operations. Instead of asking if the space could work, they ask when they can move in.<\/p>\n<p data-start=\"6863\" data-end=\"7020\">In other words, IDP is not just a design philosophy. It is a practical tool that supports faster, more confident leasing decisions and long-term asset value.<\/p>\n<h3 data-start=\"7027\" data-end=\"7053\"><\/h3>\n<h2 data-start=\"7027\" data-end=\"7053\">Going further with IDP<\/h2>\n<p data-start=\"7055\" data-end=\"7316\">If you want to bring the integrated design process into your next commercial building projects, the first step is to make it an explicit requirement and to involve your project manager, design team and construction team as early as possible.<\/p>\n<p data-start=\"7318\" data-end=\"7655\" data-is-last-node=\"\" data-is-only-node=\"\">Clarify your goals, invite the right stakeholders into the room and commit to an iterative, simulation-driven integrated design process from the very first meeting. Over time, you will see the impact on optimization, energy use, leasing performance and the overall environmental performance of your portfolio.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/3&#8243;][\/vc_column][vc_column width=&#8221;1\/3&#8243;][vc_button]LISTEN TO THE WEBINAR[\/vc_button][\/vc_column][vc_column width=&#8221;1\/3&#8243;][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/1&#8243;][vc_column_text] Closing faster with the integrated design process: turning a building project into a true high-performance asset On the<a class=\"moretag\" href=\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\"> Read the full article patate&#8230;<\/a><\/p>\n","protected":false},"author":14,"featured_media":73032,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"mc4wp_mailchimp_campaign":[],"footnotes":""},"categories":[1941,1939],"tags":[],"resource-type":[3983],"resource-format":[4068],"class_list":["post-72889","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expert-insights","category-featured","resource-type-article-en","resource-format-blog"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Integrated Design Project | Collaboration and Innovation | A+<\/title>\n<meta name=\"description\" content=\"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Integrated Design Project | Collaboration and Innovation | A+\" \/>\n<meta property=\"og:description\" content=\"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\" \/>\n<meta property=\"og:site_name\" content=\"A+\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/avantageplus\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-02T13:00:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-02T20:57:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"A+\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"A+\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\"},\"author\":{\"name\":\"A+\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599\"},\"headline\":\"Why phased planning in an integrated design project accelerates complex project delivery\",\"datePublished\":\"2025-12-02T13:00:26+00:00\",\"dateModified\":\"2025-12-02T20:57:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\"},\"wordCount\":1085,\"image\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg\",\"articleSection\":[\"Expert Insights\",\"Featured\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\",\"url\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\",\"name\":\"Integrated Design Project | Collaboration and Innovation | A+\",\"isPartOf\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg\",\"datePublished\":\"2025-12-02T13:00:26+00:00\",\"dateModified\":\"2025-12-02T20:57:57+00:00\",\"author\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599\"},\"description\":\"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage\",\"url\":\"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg\",\"contentUrl\":\"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Montreal-planification-phase-aplus\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.avantage-plus.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why phased planning in an integrated design project accelerates complex project delivery\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/#website\",\"url\":\"https:\/\/www.avantage-plus.com\/en\/\",\"name\":\"A+\",\"description\":\"Entreprise en construction\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.avantage-plus.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599\",\"name\":\"A+\",\"description\":\"A+ conceptualise et construit des espaces durables ax\u00e9s sur le bien-\u00eatre de leurs occupants. A+ r\u00e9alise ses projets en gestion de projet collaborative et int\u00e9gr\u00e9e et offre \u00e0 ses clients le plus haut niveau de qualit\u00e9 en mati\u00e8re de design, d'expertise en am\u00e9nagement durable et de technologies int\u00e9gr\u00e9es.\",\"url\":\"https:\/\/www.avantage-plus.com\/en\/blogue\/author\/avantage-plus\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Integrated Design Project | Collaboration and Innovation | A+","description":"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/","og_locale":"en_US","og_type":"article","og_title":"Integrated Design Project | Collaboration and Innovation | A+","og_description":"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.","og_url":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/","og_site_name":"A+","article_publisher":"https:\/\/www.facebook.com\/avantageplus\/","article_published_time":"2025-12-02T13:00:26+00:00","article_modified_time":"2025-12-02T20:57:57+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg","type":"image\/jpeg"}],"author":"A+","twitter_card":"summary_large_image","twitter_misc":{"Written by":"A+","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#article","isPartOf":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/"},"author":{"name":"A+","@id":"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599"},"headline":"Why phased planning in an integrated design project accelerates complex project delivery","datePublished":"2025-12-02T13:00:26+00:00","dateModified":"2025-12-02T20:57:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/"},"wordCount":1085,"image":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage"},"thumbnailUrl":"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg","articleSection":["Expert Insights","Featured"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/","url":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/","name":"Integrated Design Project | Collaboration and Innovation | A+","isPartOf":{"@id":"https:\/\/www.avantage-plus.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage"},"image":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage"},"thumbnailUrl":"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg","datePublished":"2025-12-02T13:00:26+00:00","dateModified":"2025-12-02T20:57:57+00:00","author":{"@id":"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599"},"description":"Discover how integrated design projects unite creativity, collaboration, and functionality to transform spaces.","breadcrumb":{"@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#primaryimage","url":"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg","contentUrl":"https:\/\/eadn-wc05-5238924.nxedge.io\/wp-content\/uploads\/2025\/11\/yohann-libot-nrRBfmnhFa8-unsplash-scaled.jpg","width":2560,"height":1707,"caption":"Montreal-planification-phase-aplus"},{"@type":"BreadcrumbList","@id":"https:\/\/www.avantage-plus.com\/en\/blogue\/collaboration-and-innovation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.avantage-plus.com\/en\/"},{"@type":"ListItem","position":2,"name":"Why phased planning in an integrated design project accelerates complex project delivery"}]},{"@type":"WebSite","@id":"https:\/\/www.avantage-plus.com\/en\/#website","url":"https:\/\/www.avantage-plus.com\/en\/","name":"A+","description":"Entreprise en construction","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.avantage-plus.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.avantage-plus.com\/en\/#\/schema\/person\/40fec8f9922d0f02597eb34170458599","name":"A+","description":"A+ conceptualise et construit des espaces durables ax\u00e9s sur le bien-\u00eatre de leurs occupants. A+ r\u00e9alise ses projets en gestion de projet collaborative et int\u00e9gr\u00e9e et offre \u00e0 ses clients le plus haut niveau de qualit\u00e9 en mati\u00e8re de design, d'expertise en am\u00e9nagement durable et de technologies int\u00e9gr\u00e9es.","url":"https:\/\/www.avantage-plus.com\/en\/blogue\/author\/avantage-plus\/"}]}},"_links":{"self":[{"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/posts\/72889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/comments?post=72889"}],"version-history":[{"count":4,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/posts\/72889\/revisions"}],"predecessor-version":[{"id":73034,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/posts\/72889\/revisions\/73034"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/media\/73032"}],"wp:attachment":[{"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/media?parent=72889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/categories?post=72889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/tags?post=72889"},{"taxonomy":"resource-type","embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/resource-type?post=72889"},{"taxonomy":"resource-format","embeddable":true,"href":"https:\/\/www.avantage-plus.com\/en\/wp-json\/wp\/v2\/resource-format?post=72889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}